SRWB needs K500m to construct a new water intake pump house at Liwonde’s Kamuzu Barrage to address flood-induced challenges
Rising water of the Shire River in Liwonde * The opening of the water exit gates at the barrage would further affect their operations and even other institutions downstream * Thus the need of the half a billion kwacha to maintain its pumping system at Liwonde barrage, owing to rising water levels in Shire River Maravi Express Southern Region Water Board (SRWB) needs K500m to construct a new water intake pump house at Kamuzu Barrage in Liwonde, the Board’s…









